E2E Integration Tests Plan

Objective

Implement end-to-end integration tests that validate real request paths from frontend test clients to gateway, backend services, and PostgreSQL/Redis persistence.

Scope

  • Validate real backend integration through gateway (/api/v1).
  • Assert persistence side effects in service databases.
  • Keep existing fast frontend-only Playwright tests unchanged.
  • Add a dedicated full-stack Playwright suite and dedicated environment bootstrap.

Success Criteria

  • A dedicated command starts full-stack dependencies and runs integration E2E tests.
  • At least 3 golden scenarios are covered with API + DB assertions.
  • CI-ready artifacts and deterministic reset/seed flow are in place.
  • Frontend lint/unit/E2E checks still pass.

Phases

Phase 1: Dedicated Full-Stack Environment

  1. Create an E2E env file for compose with isolated ports.
  2. Reuse production compose stack with auth disabled for test mode.
  3. Add global setup/teardown scripts for Playwright to:
    • boot required services,
    • wait for health readiness,
    • reset DB state before suites.

Phase 2: Data Reset + DB Assertion Tooling

  1. Add helper utilities to execute SQL assertions against Postgres in Docker.
  2. Add deterministic DB reset/truncate helpers across service databases.
  3. Add optional seed helpers for initial baseline data.

Phase 3: Full-Stack Test Scenarios

  1. Leaderboard persistence and UI rendering:
    • POST update through gateway,
    • assert row in leaderboards.leaderboard_entries,
    • verify frontend leaderboard page renders persisted player.
  2. Admin question CRUD persistence:
    • create/update/delete question through gateway admin endpoints,
    • assert questions.questions row state after each operation.
  3. Gateway + service health and contract checks:
    • verify integration health endpoints and stable response envelopes.

Phase 4: Commands and CI Integration

  1. Add dedicated Playwright config for full-stack suite.
  2. Add frontend script to run full-stack E2E.
  3. Add make command wrapper for full-stack E2E.
  4. Keep this suite separate from fast frontend-only E2E.

Phase 5: Stabilization

  1. Use deterministic IDs and explicit cleanup.
  2. Force serial execution for integration suite to avoid DB race conditions.
  3. Collect actionable failure outputs (HTTP body + SQL counts) in assertions.

Deliverables

  • infrastructure/e2e/.env.e2e
  • frontend/apps/web/playwright.fullstack.config.ts
  • frontend/apps/web/e2e/full-stack/* tests + helpers + setup/teardown
  • frontend/package.json script additions
  • Makefile target additions